Jump to Navigation

Middle Truckee River Watershed

Placer County and Town of Truckee 2013 Joint Annual Monitoring Report for the Truckee River Water Quality Monitoring Program

Summary: 
Final Annual Monitoring Report for Water Year 2013. Includes continuous turbidity and sediment load estimates for the Truckee River and Martis Creek. The associated MS Project database is also posted.
Primary Contact: 
Rights: 
Creative Commons - Commercial Use OK
Status: 
Ongoing
Date Range: 
2014-01-13 - 2015-01-15

Placer County Final Annual Report for the Implementation of the Truckee River Water Quality Monitoring Plan, Water Year 2010

Summary: 
This report presents the first year results for the Placer County, CA (County) portion of the Truckee River Water Quality Monitoring Plan (TRWQMP).
Primary Contact: 
Rights: 
Creative Commons - Commercial Use OK
Status: 
Ongoing
Contributors: 
Date Range: 
2012-03-30

The County began the implementation of its portion of the Phase 1 components during the 2010 water year (October 1, 2009 through September 30, 2010). Phase 1 activities were limited by available funding to a set of select monitoring activities in the Bear, Squaw and Martis Creek watersheds. The activities performed during the first year included:

Town of Truckee Annual Report for the Implementation of the Truckee River Water Quality Monitoring Plan, Water Year 2010

Summary: 
Final annaul monitoring report documenting results of the Town of Truckee's first year of implementation of the Truckee River Water Quality Monitoring Plan.
Primary Contact: 
Rights: 
Creative Commons - Commercial Use OK
Status: 
Ongoing
Date Range: 
2012-03-26

As a Small Municipal Separate Storm Sewer System (MS4), the Town of Truckee

(Town) must comply with the State’s general National Pollutant Discharge

Elimination System (NPDES) permit for stormwater discharges. In accordance with

these regulations, the Town has developed a Storm Water Management Program

(SWMP) which was required by the Lahontan Regional Water Quality Control Board

Placer County and Town of Truckee: Final Joint Annual Monitoring Report for the Implementation of the Truckee River Monitoring Plan, Water Year 2011

Summary: 
The joint annual monitoring report was prepared for the Town of Truckee and Placer County and presents the results of monitoring activities conducted in the Middle Truckee River watershed during the 2011 water year.
Primary Contact: 
Rights: 
Creative Commons - Commercial Use OK
Status: 
Ongoing
Date Range: 
2012-03-15

 

This Joint Annual Monitoring Report describes the monitoring activities performed by Placer County and the Town of Truckee during WY 2011 and presents their results. Data collection activities during this second year of the TRWQMP’s implementation included:

  • Community level (stormwater runoff) discrete water quality sampling within the Truckee Town Corridor and the Martis Creek sub-watersheds,
  • Tributary level discrete water quality sampling within the Martis Creek watershed, and
  • Continuous discharge monitoring on Martis Creek.

No rapid assessments or bioassessments were performed during WY 2011.

Syndicate content