Town of Truckee Annual Report for the Implementation of the Truckee River Water Quality Monitoring Plan, Water Year 2010
As a Small Municipal Separate Storm Sewer System (MS4), the Town of Truckee
(Town) must comply with the State’s general National Pollutant Discharge
Elimination System (NPDES) permit for stormwater discharges. In accordance with
these regulations, the Town has developed a Storm Water Management Program
(SWMP) which was required by the Lahontan Regional Water Quality Control Board
(Board) to include the development of a comprehensive water quality monitoring
plan. Additionally, a Total Maximum Daily Load (TMDL) has been adopted by the
Water Board to control sediment loading to the Middle Truckee River including
sections that pass through and receive stormwater runoff from the Town. The Truckee
River Water Quality Monitoring Plan (TRWQMP) (2NDNATURE, LLC, 2008) was
developed and Phase 1 is now being implemented.
The TRWQMP was developed by the Town and Placer County to provide both
entities with a comprehensive water quality monitoring plan consisting of a fifteen
year program that is intended to be implemented in three phases. The Town began
implementation of Phase 1 during the 2010 water year (October 1, 2009 through
September 30, 2010) (WY 2010) by performing the rapid assessment methodology
(RAM) to assess fine sediment distributions in stream channels, and community level
discrete sampling, to assess the water quality of stormwater runoff from targeted
community areas.
This report presents the monitoring activities that were performed during the 2010
water year and discusses their results.
| Attachment | Size |
|---|---|
| TOT TRWQMP 2010 Final Report.pdf | 11.72 MB |
